The sweater-dress concoction
November 30th, perfect day to present you my finished NaKniSweMo 2015 project – my 50 174 sts Laurie.
I am absolutely thrilled by the final result and I love every stitch of this wonderful dress, but I must admit this was not was I was going for – not the smallest bit. This project was originally supposed to be just another sweater; no more no less, and I have nobody or nothing to blame for the (happy) mistake except for my very own foolishness in thinking I could pick a pattern without checking the number of stitches first, and my sinus infection for not realizing sooner how long this “sweater” was becoming.
For those who don’t know what NaKniSweMo is, let me explain first so you can understand better what my predicament was. NaKniSweMo stands for “National Knit a Sweater in a Month”. It’s basically a month long knit-along (KAL) where the main goal is to start and finish an entire sweater within the month of november. The main criteria for this KAL is that the sweater you pick must be at least 50 000 stitches.
Earlier in November, I decided to participate, choosing Laurie (from Josée Paquin), as my project for the challenge. Even though the sweater was using DK weight yarn, I didn’t bother to check the number of stitches before I started because I thought it’d be fine since it’s kind of an oversized model and I generally like longer sweaters anyways (I have always added length to every single sweater pattern I’ve ever knitted). I cast on and worked about 50% of this sweater, carefully marking my progress as I went, but somewhere around the middle of the month, I got a sinus infection.
I was feeling groggy and out of it, but still tried to make some progress – all I could focus on though was the 50k stitches goal, that was really all I could manage given the sickly state I was in. At one point I stopped working the body, worked one sleeve as a point of reference, then calculated (based on how many stitches I already had and how may stitches both sleeves were going to be) how much longer the body needed to be in order for me to reach 50k stitches. With that knowledge, I kept working on the body again, and again, and again until I finally reached the desired amount of stitches and bound it off around November 19th.
Around that time I started to feel better and my head was finally starting to get out of the clouds, and that’s when I realized just how long my “sweater” has gotten in my sickly slumber. I tried it on and realized the finished piece was going all the way to my knee… *sigh* I had knitted a dress instead of a sweater. Fancy that. I was still very happy with the project though, so I knit the second sleeve then washed and blocked the project and voilà ! A brand new autumn dress, I guess 🙂
December 2, 2015 at 4:59 pm
I especially love it with that belt!!!
December 2, 2015 at 5:58 pm
Thank you! I bought mine at http://www.1861.ca but I think you can find the same one at http://www.modcloth.com
December 22, 2022 at 9:05 pm
[…] wash and shrank/felted to the point of being simply unwearable. This is such a shame, because that sweater/dress was just SO beautiful! This time, to save me from the heartbreak, I made it out of a sugar cane […]